Hardware Status (page 2 of 6)
Hardware Status (page 2 of 6)
- Recent changes to LUM (cont.)
- redesigned cabling to use new channels
- smaller (much smaller) footprint
- better shielding
- fewer connectors
- new cooling system to accommodate SLC’s laser wire project
- much preventative maintenance
Notes:
1) show Ray’s color slide of LUM installation
2) VXD3 people like the cooling can